Skip to Main Content
Site IDParent SiteLocationCountyEFO
4965L. T. "Pie" Hay Filter Plant (Lexington WTP)700 W. Church StreetHendersonJackson

Inspection Details

24799
4965
TN0005177
7/8/2011
Compliance Eval (non-sampling) (CEI)
In Compliance
The two settling ponds are used in parallel and cleaned out once every 10 to 12 months. They did not appear to be ready to be cleaned out yet. The area around the ponds was neat and well kept. Lexington is considering connecting to utility sewer. I met with Steve Hensley, Manager of Wastewater Services and Chris Wallace, a certified wastewater operator and his assistant.