Skip to Main Content
Site IDParent SiteLocationCountyEFO
146916Strawberry Plains SubdivisionStrawberry Plains PikeKnoxKnoxville

Inspection Details

115367
146916
TNR135951
4/4/2024
Stormwater Construction Non-Sampling
Out of Compliance
Follow-up visit with Bill Terry and Knox Co. inspectors to review CAP and all issues that still need to be addressed, including standpipe installation in Sediment Basin 1, maintaining BMPs to prevent sediment from entering road stormwater drains, and vegetation around Sediment Basin 2. See Trip Report for more details.