Skip to Main Content
Site IDParent SiteLocationCountyEFO
5172Henning Water Systems/ Waste Water Pump Station259 Morris Ferry RoadLauderdaleJackson

Inspection Details

68969
5172
TN0025011
4/23/2019
Follow-up
Out of Compliance
Inspection of lagoon showed a slough off on the North side of the lagoon. Cracks along the access road was seen. The lagoon bank is in danger of failing. Conner Franklin talked to City's consultants and he had development a plan to draw down the 1st cell of the lagoon in order to construct a bank across the 1st cell of the lagoon which would isolate the slough off area making it smaller. Influent would all be discharged to the 2nd cell during the operation. This operation was already planned using grant money.