Skip to Main Content
Site IDParent SiteLocationCountyEFO
99369Waynesboro Water System625 Green River DrWayneColumbia

Inspection Details

61866
99369
4/19/2018
Construction Inspection - Site 1
In Compliance
Final walk through of the Geissler Spring membrane filtration plant. Approval to place the facility into service is granted.