Skip to Main Content
Site IDParent SiteLocationCountyEFO
6426T and T GilkeyGilkey Road HenryJackson

Inspection Details

53777
6426
TN0074888
6/22/2017
CAFO Non-Sampling
Immediately Corrected During Inspection
Facility was maintaining required records Annual Reports have also been submitted. All (3) wastewater lagoons had over 4 feet of freeboard on day of inspection. No evidence of manure run-off observed on day of inspection. Wastewater lagoon levees needed to be mowed and facility is planning to do so. Facility indicated they typically mow wastewater lagoon levees twice a year. Facility has a (20) bay compost shed. No uncovered hog remains were observed on the day of inspection. Leachate was observed pooled in some of the compost bays but it was not leaving the compost bays due to concrete lip on the bays. Facility added additional sawdust to soak up leachate on same day as inspection and submitted photos after it had been corrected.

For further details regarding inspection please refer to 6-22-17 T and T Gilkey Inspection Documents.