Skip to Main Content
Site IDParent SiteLocationCountyEFO
170421Pleasant Grove FarmsPleasant Grove RoadSumnerNashville

Inspection Details

116152
170421
TNR246349
4/23/2024
Stormwater Construction Non-Sampling
Out of Compliance
Grading has begun for both phases of the project. A general lack of EPSCs near LOD limits allowing sediment to escape offsite. Some EPSCs have been installed (silt fence), but areas which are in need of maintenance and have allowed sediment to be deposited in stream buffer. Detention pond (not functioning as a sediment basin) appears to have discharged untreated stormwater at outfall structure. Need to install all appropriate EPSCs and maintain them until permanent stabilization is achieved.