Skip to Main Content
Site IDParent SiteLocationCountyEFO
170421Pleasant Grove FarmsPleasant Grove RoadSumnerNashville

Inspection Details

116155
170421
NR2304.078
4/23/2024
ARAP Compliance Inspection
Out of Compliance
Work appears to have begun for the waterline installation. Riparian area, banks, and channel bed have been disturbed without any water diversion or upland EPSC measures in place to prevent discharges to waters of the state. Channel has been graded and significant deposition to the feature with the potential for downgradient impacts. The area should be stabilized and/or protected from downgradient impacts in the next rain event. See photolog.