Skip to Main Content
Site IDParent SiteLocationCountyEFO
170421Pleasant Grove Farms - Phase 2Pleasant Grove RoadSumnerNashville

Inspection Details

116159
170421
NR2304.074
4/23/2024
ARAP Compliance Inspection
Out of Compliance
Work appears to have begun for the sewer line installation. Riparian area and banks have been disturbed up to the streambed, without any water diversion or upland EPSC measures in place to prevent discharges to waters of the state. Observed sediment discharges to stream. Riparian area and banks should be either stabilized or protected and flow diversion installed if utility work will commence soon. See photolog.