Skip to Main Content

    Complaint

    126388
    WPC
    3/29/2023
    Phone
    Stormwater - Construction
    3/29/2023
    17-MAY-2023 03:06PM

    Location based on SITE_ID

    Site ID
    34841
    Site
    Aden Woods
    Location
    7431 Crow Cut Road
    City
    Fairview
    Description
    Continuation of Aden Woods Subdivision. Development consists of the construction of one local road and 20 single-family, residential lots.
    County
    Williamson
    EFO Name
    Nashville
    Site Owner
    Brandon Robertson

    Investigation Results

    NOV
    4/19/2023
    5/3/2023
    Yes

    Complaint Description and Writeup

    The problem is a retention pond overflow at a nearby subdivision which allows the runoff to go right into the springs starting point and contaminates the whole creek. For years, prior to the neighborhood, we never had this problem before. And when the water resides, the rocks are covered with red mud, which is obviously from the new subdivisions' storm drains.