Skip to Main Content

    Complaint

    46480
    WPC
    2/8/2018
    Email
    Sewage Bypass / Overflow
    17-JAN-2020 10:28AM

    Location based on SITE_ID

    Site ID
    5027
    Site
    Church Hill STP
    Location
    VFW Road (STP) 300 East Main Blvd(City Hall)
    City
    Church Hill
    Description
    Treatment of municipal sewage
    County
    Hawkins
    EFO Name
    Johnson City
    Site Owner
    City of Church Hill

    Investigation Results

    Issue Resolved
    2/7/2018
    Church Hill
    2/7/2018

    Complaint Description and Writeup

    Church Hill had an overflow that occurred at the Holliston Mills pump station. The overflow occurred as a result of a rain event.3500 gallons was estimated to be lost. The area was cleaned and lime was applied for disinfection.