Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Complaints
Complaint Details
Complaint
Complaint Number
25557
DWR Program Area
WPC
Date Received
6/6/2012
How Received
In Person
Concerning
Erosion / Sediment
Concerning (Other)
Assigned on
6/7/2012
Record Last Updated
15-MAY-2019 01:45PM
Location based on SITE_ID
Site ID
11017
Site
City of Springfield
Location
Springfield
City
Springfield
Description
-
County
Robertson
EFO Name
Nashville
Site Owner
City of Springfield
Investigation Results
Status
Closed
Date Investigated
6/8/2012
Responsible Party
City of Springfield Gas Department
Completed on
6/12/2012
Referred To
Referred on
Photos
Yes
Complaint Description and Writeup
Complaint Description and Writeup
Complaint: Springfield Gas Company punctured a water main during construction which resulted in a discharge of muddy water to stream. - AMM
During my investigation on June 8, 2012, I observed that land disturbing activities had recently occurred along Martin Chapel Road as a result of an accidental water main punture during the installation of a natural gas transmission line. No EPSC measures were in place and the disturbed area had not been stabilized. As a result, soil was observed in the street as well as in the drainage ditch along Martin Chapel Road which could ultimately move into Sycamore Creek. LAF
6-12-12 Spoke to Mr. George Hall with City of Springfield (owner/developer-TNR148002), who confirmed the discharge and land disturbance was due to two water main punctures occuring approximately 50 feet apart. Mr. Hall indicated Springfield's Gas Department was using effective EPSC measures at outfalls and stabilizing with seed and straw after every 1/4 mile of gas line trench was dug. He indicated that the sediment on the street I observed came from the equipment used by the Springfield Water Department to repair the damaged water main. LAF