Skip to Main Content

    Complaint

    43198
    WPC
    4/24/2017
    Phone
    Sewage Bypass / Overflow
    4/24/2017
    17-JAN-2020 10:28AM

    Location based on SITE_ID

    Site ID
    5027
    Site
    Church Hill STP
    Location
    VFW Road (STP) 300 East Main Blvd(City Hall)
    City
    Church Hill
    Description
    Treatment of municipal sewage
    County
    Hawkins
    EFO Name
    Johnson City
    Site Owner
    City of Church Hill

    Investigation Results

    Issue Resolved
    4/24/2017
    Church Hill
    4/23/2017

    Complaint Description and Writeup

    Area had several inches of rain. The pump station at Holliston Mills overflowed 3500 gallons of wastewater on April 23, 2017. The rain subsided and the pump station was able to pump the volume of water that was entering the system. The area was cleaned around the lift station and then lime was applied for disinfection.