Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Complaints
Complaint Details
Complaint
Complaint Number
134614
DWR Program Area
WPC
Date Received
12/2/2024
How Received
Email
Concerning
Sewage Bypass / Overflow
Concerning (Other)
Algae
Assigned on
Record Last Updated
03-DEC-2024 09:07AM
Location based on SITE_ID
Site ID
4913
Site
Nashville Central STP
Location
1600 Second Avenue North
City
Nashville
Description
Treatment of municipal sewage and minimization of combined sewer overflow
County
Davidson
EFO Name
Nashville
Site Owner
Metropolitan Government - Metro Water Services
Investigation Results
Status
Open
Date Investigated
12/2/2024
Responsible Party
Completed on
Referred To
Referred on
Photos
Complaint Description and Writeup
Complaint Description and Writeup
Complainant states "I passby the upper most end of JPP Hamilton Creek daily. The lake water at this location must be polluted. Algae blooms or worse continue visually evident. A Metro sewage holding facility is located directly across Smith Springs Rd. I strongly suspect this Metro facility has failed or is highly overloaded. I thought Resource Mgt would have alerted you to this. Please let me know what's happening."
JMF Responded to Complainant: "Metro Nashville does have a large sewer pump station at that location. The pump station includes storage tanks to contain excess water during heavy rain events; no sewage should be in the tanks during normal operation, basically just dilute waste during rain events. Despite that, there are still sewage overflows from this pump station on occasion. Nashville is aware and has carried out a number of sewer rehabilitation projects upstream of this location to reduce the sources of excess flow, and has several more projects planned in the future. Lots of details can be found at https://www.cleanwaternashville.org/project-map. Looking at our records, they have only reported 4 overflows from this pump station in the last two years, however the most recent was reported September of this year.
Nashville has flow monitoring all throughout their system. I would be surprised if there was a leak of any meaningful volume that they wouldn’t have noted and reported, but it’s not impossible.
I’ve cc’d the inspector currently assigned to Metro Central STP, that this pump station eventually goes to. Please let me know if there are additional questions or concerns and we can loop in anyone else that seems necessary."
12/3/24 Phone call to Metro Brent Freeman, will send crew to check area and CCTV lines to see if possible pipe damage