Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Complaints
Complaint Details
Complaint
Complaint Number
30598
DWR Program Area
WPC
Date Received
10/31/2013
How Received
Phone
Concerning
Sewage Bypass / Overflow
Concerning (Other)
Assigned on
10/31/2013
Record Last Updated
02-DEC-2013 12:45PM
Location based on SITE_ID
Site ID
1931
Site
Tennessee Wastewater Systems, Inc. - Maple Green Reclamation Facility
Location
Sandy Springs Road
City
Coopertown
Description
This modification authorizes operation of septic tanks, effluent collection system and conversion from deep cell lagoon to recirculating media filter and fenced drip irrigation system
County
Robertson
EFO Name
Nashville
Site Owner
Tennessee Wastewater Systems, Inc.
Investigation Results
Status
Issue Resolved
Date Investigated
11/1/2013
Responsible Party
Tennessee Wastewater Systems, Inc.
Completed on
11/1/2013
Referred To
Referred on
Photos
Complaint Description and Writeup
Complaint Description and Writeup
Complaint: The smell of sewage is present in conjunction with black substance on the ground. The presentation is consistent and does not seem to change over time. The best way to view it is to take the drive between the Mapco and BP stations to the truck fueling area and view it in the vicinity of yellow poles. To travel there, go west on I-24 and go to the right after exiting. Mapco is on the left. ***
On 10/31/13, MRT called Brian Carter, Adenus Operations & left a message regarding this problem. ***
On 11/1/13, Carter left a message for MRT. Carter said he had a crew on the scene & they had found a problem w/a collection system line behind the MAPCO. MRT later called Carter to confirm this information. Carter said repairs should be completed today. He will send a report on Monday. ***
On 11/1/13, MRT visited the site & observed the cracked collection system line being repaired. Elite Septic Pumping was on site & had already hauled two 4,000 gal loads to the Springield STP. The water pumped was from the drainage ditch on York Rd north of the MAPCO. They pumped water from the pit excavated for the repair, during the repair & then filled the truck with one additional load from the ditch. There was standing water in the ditch both north & south of the repair point from heavy rain the previous evening. The area around the repair point & south to the MAPCO entrance was roped off w/caution tape. Carter said he will place lime on the area when the water recedes. ***
On 11/7/13, MRT visited the site & observed that lime had been applied to the area in question.