Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
GUEST
---
Go to Home Page
Home
Permits
Permits on Public Notice
Permits on Public Notice (Map)
Moratoriums
Permit Types
Permitting Actions
Permit Appeals
Documents
Complaints
Inspections
Engineering Plans
Sewage Works
Public Water Systems
Hydrologic Determinations
Exceptional Waters
Ambient Monitoring
Ambient Monitoring Stations
Surface Waters Chemical Data
Tissue Monitoring Data
Habitat Assessments
SQSH Data
QLP Data
Oil & Gas Wells
Water Wells
Licensed Drillers
Driller Report
Notices of Intent
Certified Operators
Septic Systems
Active Pumpers and Installers
Home
DWR Complaints
Complaint Details
Complaint
Complaint Number
79590
DWR Program Area
WPC
Date Received
1/15/2020
How Received
Email
Concerning
Pollution / Spills / Illicit Discharge
Concerning (Other)
Assigned on
1/15/2020
Record Last Updated
20-NOV-2023 12:13PM
Location based on SITE_ID
Site ID
6639
Site
Memphis Ready Mix Denie Road Plant
Location
1029 John A Denie Road
City
Memphis
Description
Ready Mix Concrete Facility
County
Shelby
EFO Name
Memphis
Site Owner
Buzzi Unicem LLC dba Memphis Ready Mix
Investigation Results
Status
Advisement Letter
Date Investigated
1/27/2020
Responsible Party
Buzzi Unicem LLC dba Memphis Ready Mix
Completed on
2/14/2020
Referred To
Referred on
Photos
Yes
Complaint Description and Writeup
Complaint Description and Writeup
1-15-20: Complainant contacted Wade Murphy in NCO about concerns of discolored runoff from the RMCP facility on 1029 John Denie Road (TNG110019).
1-15-20: JEBr assigned the complaint to GCC with DWR for investigation.
1-27-20: GCC performed a full Compliance Evaluation Inspection at the facility. The cementitious veneer below the outfall was present, but there was no discharge at the time of the inspection. The new environmental contact for Buzzi Unicem/MRM stated that they would have the cementitious material lab-tested for content. Buzzi Unicem/MRM also agreed to extend the block wall along the south end of the east side across the south perimeter around the waste concrete stockpile while they work the stockpile down to a more manageable size.
2-6-20: GCC emailed results of the CEI to Mr. Gregory.
2-14-20: emailed CEI, cover letter, and photos to D. Schwend/Buzzi Unicem dba Memphis Ready Mix.