    Complaint

    41366
    WPC
    10/17/2016
    Phone
    Sewage Bypass / Overflow
    10/17/2016
    03-MAY-2019 10:18AM

    Location based on SITE_ID

    Site ID
    5253
    Site
    Wartburg STP
    Location
    3035 Morgan County Highway
    City
    Wartburg
    Description
    Treatment of domestic sewage
    County
    Morgan
    EFO Name
    Knoxville
    Site Owner
    City of Wartburg

    Investigation Results

    No Problem Found
    10/17/2016
    Wartburg STP
    10/21/2016
    Yes

    Complaint Description and Writeup

    Per Mr. Bunch:
    (1)(a)Raw sewage from SSO at manhole in Mr. Bunch's yard entered the creek (Flat Fork) and has pooled there for 2 1/2 months. Due to drought there has been no flow in the creek to flush it out. (b)Lime was not applied to overflow.
    (2)Mr. Bunch does not believe the state and City will ever get the problem at PS#1 solved. It has been ongoing for a number of years.

    10-18-2016 through 10-20-2016 follow-up:
    1) short-term: (a) requesting Wartburg to pump out raw sewage if any pooled in creek; Mayor Dagley committed to do this immediately. Operator to investigate and take photos.Operator reported stagnant water at PS #1 and u/s of PS #1, but no signs of raw sewage. Photos submitted; evaluated; no raw sewage noted. (b)requesting Wartburg lime residuals if any on the ground. Operator unaware that there have been any recent overflows at Mr. Bunch's property, since manhole paved over and sewage would have to be really backed up. There was a reported overflow at MH 1-7 about two weeks ago. Operator put out hay bales, chlorine tablets, and lime 10-19-16 in case there is a future overflow at MH 1-7 due to PS #1. Photo submitted.
    2) long-term: requesting status report on upcoming 2017 corrective actions proposed in capital improvements plan for LS #11 and PS #1. NRH 10-21-16