19-DEC-2024
Daniel Lawrence
Virginia Lawrence
SRM Materials
Franklin
Franklin
Boiling Fork Creek
3
HD was submitted to TDEC Columbia EFO on 8/16/24. Columbia EFO staff uploaded the HD document to a prior HD from 2021 at the same facility, which was already complete. DMGR was not aware of the HD submittal until a meeting with SRM on December 10, 2024. Site visit conducted 12/19/24. One feature concurred with, two had significant questions.
normal
16-AUG-2024
16-AUG-2024
Consultant
No
06-JAN-2025
Yes
35.15989
-86.00611

Determination Documents

ViewAuthorFile typeMailed date
DPLLetter1/6/2025
Billy PlantReport8/16/2024