Hydrologic Determination

05-SEP-2024
Tayler Schudel
Heather Smith
The Parke PD (HL385 Tract)
Shelby
West of Houston Levee Road and North of Highway 385
7
EnSafe performed hydrologic determinations and wetland
delineations on the site in 2016 and 2019. TDEC issued concurrence letters for these investigations on January 9, 2017 (#QHP1605.015) and September 20, 2019 (#QHP1905.021), respectively. Because concurrence letters are good for only five years, the earlier determination is no longer valid and the second determination will
expire in September of this year. The Preliminary Jurisdictional Determination issued by USACE on October 23, 2017 (MVM-2017-307) is also now expired.
3/9 = 0.11, 3/10=0.1
normal
07-AUG-2024
No
35.029303
-89.726197

Determination Documents

ViewAuthorFile typeMailed date
Margaret LeeReport8/7/2024