Skip to Main Content
  • Home
  • Report on Sewer Moratoriums

  • 1 - 47 of 47
EFO NameCountyPermit NoPermittee NameStatusProblemMechanismResultAction DatePercent Annual I/I
KnoxvilleScottTN0064424Town of OneidaActiveChronic OverflowsLetter-3/25/201959
KnoxvilleKnoxTN0078905Hallsdale Powell Utility DistrictActiveI/IEFO CommunicationHDPUD acknowledged the existence of a Self-Imposed Moratorium (SIM) in a letter from Jacobs Engineering, July 7, 2015 requesting a waiver of the SIM based on approval of the CAP-ER. May 23, 2016, Compliance Enforcement approved the CAP-ER and included language "Implementation of CAP-ER will enable compliance with the self-imposed moratorium language in the NPDES Permit...". The CAP-ER requires HPUD to certify new connections based on hydraulic modeling. In a July 2019 meeting between KEFO and HDPUD, it was agreed that HDPUD would include a certifying statement in all plans submitted that hydraulic modeling had been done and validated the system can handle the added flows. Robert Ramsey email dated 4/16/194/17/201958
NashvilleRobertsonTN0020621City of GreenbrierActiveChronic OverflowsCommissioner's OrderTotal Moratorium for connections to the Greenbrier Collection System.WPC21-0065 with connection credits to be authorized by the city.1/6/202252
ColumbiaLewisSOP-09007City of HohenwaldActiveChronic OverflowsLetterSelf-imposed moratorium at the 48 South Lift Station for more than five overflows. 4/24/2019-
ChattanoogaMcMinnTN0021938Town of EnglewoodActiveChronic OverflowsLetterNotice of Violation issued on 12/14/2012 for chronic overflows at three locations. Response to NOV on 1/14/2013 state that the Board of Alderman had voted to implement self imposed moratorium.1/14/2013-
KnoxvilleScottTN0020753Town of HuntsvilleActiveOverflowsEFO CommunicationAs of CEI Sept 30, 2019. Moratorium at Express Mart pump station which as the last pump prior to the plant effectively becomes a system wide moratorium.10/7/2019-
ColumbiaLawrenceTN0022551Lawrenceburg Utility SystemsActiveChronic OverflowsLetterSelf imposed moratorium on connections that flow to West Point Pump Station2/12/2018-
ColumbiaFranklinSOP-83005Sewanee Utility District of Franklin & Marion CountiesActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Mikell Lane Lift Station for more than five overflows from January 2020 through May 2020. 6/1/2020-
ColumbiaMarshallTN0022888City of LewisburgActiveChronic OverflowsLetterSelf-imposed moratorium on connections which ultimately flow to the sewer manhole at 457 Joyce Avenue due to more than 5 overflows/releases between Feb. and Oct. 2020.11/20/2020-
ColumbiaMarshallTN0061841Lewisburg Water and Sewer Department (Cornersville)ActiveChronic OverflowsLetterOverflows/releases at Flow Equalization Tank (FET)1/9/201981
ChattanoogaMcMinnTN0021938Town of EnglewoodActiveChronic OverflowsLetterAction taken 1/14/13 notified by letter dated 1/17/131/14/201381
ChattanoogaHamiltonTN0021211Hamilton County Water & Wastewater Treatment Authority (WWTA)ActiveI/IPermitPart III - G of Permit10/1/2007-
JacksonGibsonTN0021563City of DyerActiveChronic OverflowsLetter607 North Main Street and the Becton Street lift station running parallel to Sand Creek has reported 15 overflows to our MyTDEC system since 9/1/2023-- the permit conditions requiring a self-imposed moratorium have been met.2/13/202472
KnoxvilleMorganTN0028622Plateau Utility DistrictActiveChronic OverflowsLetter 11/9/2017-
Johnson CitySullivanTN0023531Joint Sewerage System, a joint venture of City of Bristol TN and Bristol Virginia Utilities AuthorityActiveChronic OverflowsLetterSelf-Imposed moratorium triggered at Sinking Creek pump station and Tri County Industrial Park pump station due to chronic overflows. Permittee was advised via inspection report dated 05-NOV-2020.11/5/202060
ChattanoogaBradleyTN0024121Cleveland Utilities Authority (CUA)ActiveChronic OverflowsLetterWildwood Basin Manhole 71-65 (22-DEC-09); Manhole 4-11 (03-JUL-19), and Manhole 10-1AA (03-JUL-19)12/22/200956
Johnson CityGreeneTN0021229Town of GreenevilleActiveChronic OverflowsLetter 220 Thornwood Drive - Chronic SSOs3/5/2019-
NashvilleHumphreysTN0021741City of McEwenActiveChronic OverflowsPermitSelf-Imposed Moratorium started on 12/23/2003. Subsequent total moratorium on connections imposed via Commisioner's Order WPC12-0113. See Item 7, under Order & Assessment Section (page 21). While order is now closed, the system remains under a moratorium via the permit.6/5/201372
ChattanoogaHamiltonSOP-89044Hamilton County Water & Wastewater Treatment Authority (WWTA)ActiveChronic OverflowsLetterLetter 12/18/201812/18/2018-
JacksonLauderdaleTN0025011Town of HenningActiveO & M:WWTP OverloadAgreed OrderMoratorium was in previous Agreed Order WPC12-0020, signed 3/6/14. The Commissioner's Order sign date was 9/4/13, but then the order was appealed and an agreed order was signed 3/6/14. See Item 8 of Order & Assessment Section (p14/18). 3/6/201479
ColumbiaLawrenceTN0022551Lawrenceburg Utility SystemsActiveChronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to Garner Lane.2/25/2020-
ColumbiaLawrenceTN0022551Lawrenceburg Utility SystemsActiveChronic OverflowsLetterSelf imposed moratorium on connections that ultimately flow to at Veteran's Park.2/25/2020-
CookevilleClayTN0063886City of CelinaActiveOverflowsEFO CommunicationCity of Celina performed a Self Imposed Moratorium due to chronic overflows within the collection system. The City has developed a Corrective Action Plan with James C. Haley and Associates. the City is seeking funding. 3/16/202075
ColumbiaLawrenceTN0022551Lawrenceburg Utility SystemsActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Simms Street. 3/26/2020-
ColumbiaFranklinTN0020508City of DecherdActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to the Noles Street MH2953/30/2020-
ColumbiaBedfordTN0024180Shelbyville Power, Water & Sewerage SystemActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to the sewer manhole at Pickle Street 17-B due to more than 5 overflows within a 12 month period.12/7/2020-
Johnson CityCarterTN0023515City of ElizabethtonActiveChronic OverflowsLetterChronic Overflow point is manhole at Cherokee pump station. Permittee notified of moratorium requirements via NOV dated 05-May-215/21/2021-
ColumbiaLawrenceTN0022551Lawrenceburg Utility SystemsActiveChronic OverflowsLetterSelf imposed moratorium on connections to the collections system that ultimately flow to Old Waynesboro Highway.3/30/2022-
ColumbiaBedfordTN0024180Shelbyville Power, Water & Sewerage SystemActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to 1913 Wartrace Pike due to more than 5 overflows within a 12 month period.4/9/2024-
ColumbiaCoffeeTN0025038City of ManchesterActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A39.4/30/2024-
ColumbiaCoffeeTN0025038City of ManchesterActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole A43.4/30/2024-
ColumbiaCoffeeTN0025038City of ManchesterActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole I141A.5/7/2024-
ColumbiaCoffeeTN0025038City of ManchesterActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B43.5/16/2024-
ColumbiaCoffeeTN0025038City of ManchesterActiveChronic OverflowsLetterSelf-imposed moratorium on connections to the wastewater collection system that ultimately flow to Manhole B49.10/2/2024-
ColumbiaFranklinSOP-83005Sewanee Utility District of Franklin & Marion CountiesActiveChronic OverflowsLetterSelf-imposed moratorium for more than five overflows at the Alto Lift Station.12/29/2015-
ColumbiaLewisSOP-09007City of HohenwaldActiveChronic OverflowsLetterSelf-imposed moratorium at Piney Lift Station for more than 5 overflows in a 12 month period1/4/201668
ChattanoogaMcMinnTN0067539Athens Utilities Board (AUB)ActiveChronic OverflowsLetterSelf-Imposed Moratorium for Sterling Road Pump Station on Lions Park Road2/27/202053
ChattanoogaMeigsTN0058521Town of DecaturActiveChronic OverflowsLetterSelf Imposed Moratorium on connections upstream of three chronic overflow locations7/6/202250
KnoxvilleUnionTN0022870City of MaynardvilleActiveChronic OverflowsLetter-4/28/2017-
ColumbiaHickmanTN0024937Town of CentervilleActiveChronic OverflowsLetterSelf-imposed moratorium at the Defeated Creek Manhole 1 - see letter dated 1/9/19 from Columbia EFO1/9/201942
NashvilleDicksonTN0066958Water Authority of Dickson CountyActiveOverflowsLetterSelf-imposed moratorium for the Mt. Sinai lift station basin. 4/6/202337
JacksonCarrollTN0020613City of McKenzieActiveI/IAgreed OrderMoratorium was established under previous order WPC12-0146A and carried into the current order. See Item 8 under Section Order & Assessment (page 16) 3/17/201766
NashvilleSumnerTN0021865City of PortlandActiveI/I:Permit ViolationsCommissioner's OrderMoratorium on Connections see Item 8 under Order & Assessment Section (page 15).4/18/201758
KnoxvilleKnoxTN0023582Knoxville Utilities Board (KUB)ActiveI/I:OverflowsAgreed OrderReference "Moratorium" file on H:/4/10/201939
NashvilleWilsonTN0025488City of WatertownActiveChronic OverflowsPermitChronic overflows reported via the CMOM triggering a SIM per the permit language in Section 2.3.3. Applicable to Basin 1 8/31/202161
NashvilleWilliamsonSOP-88068City of BrentwoodActiveChronic OverflowsLetterMoratorium enacted under Agreed order from 2006. Current location of concern is manhole 7/31. 2/26/2003-
CookevilleWhiteTN0061166City of SpartaActiveOverflowsLetterSelf-Imposed2/24/200662
  • 1 - 47 of 47