Skip to Main Content

Driller Report Summary

WELL NUMBER

Well Number
20241510
Driller Tag Number
D0130394
Inspection Tag Number
-
Date Received
06/24/2024

WELL CONTRACTOR

License Number
936
Driller Name
Nicholas Dain Dempsey
Rig Operator
NICHOLAS DEMPSEY

WELL LOCATION

County Name
FRANKLIN
Driller Map No.
-
Quad Name
SEWANEE
Quad Number
0094NW
Quad Nth
5
Address
10593 SEWANEE HWY
Address Line 2
-
City Name
SEWANEE
State Name
Tennessee
Zip
37375
Zip Ext
-
Distance From Landmark (miles)
-
Direction From Landmark
-
Nearest Landmark
-
Latitude
35.1783637
Longitude
-85.9419419

TYPE OF WORK

Date Drill Rig Left Site
05/09/2024
Type of Work
New Well

WELL COMPLETION DATA

Completion Date
05/09/2024
Total Depth (ft-bgs)
500
Depth To Bedrock (ft)
35
Static Level (ft-bgs)
80
Estimated Yield (GPM)
3

WATER-BEARING ZONES

WELL TEST

Tested By
Blowing
Static Level (ft-bgs)
-
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
-
Hours Prior to Test
-
Minutes Prior to Test
-

FORMATION LOG

030OVERBURDEN CLAYS
3042BLUE SANDSTONE
42500MULTI COLORED SANDSTONE

WELL OWNER INFORMATION

Company Name
-
Owner Name
MICHAEL CANNON
Address
10593 SEWANEE HWY
Address (Line 2)
-
City
SEWANEE
State
Tennessee
Zip Code
37375

PROPOSED USE OF WELL

Well Use
Residential

PRIMARY CASING

Diameter (in)
6
Top Set (in-above ground)
15
Primary Casing Depth (ft-bgs)
42
Primary Casing Type
Steel
Wall Thickness
.188
SDR#
-

WELL FINISH

Well Finish
Open Hole
From (ft-bgs)
42
To (ft-bgs)
500
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-

BACK FILL MATERIAL

Bentonite015
Cuttings1542

LINER CASING

Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-

ANTICIPATED WATER QUALITY

Appearance
Clear
Taste
-
Odor
-
Other
-

GENERAL INFORMATION

Well Disinfected?
Y
Well Capped?
Y
50ft From Septic System?
-
Septic Distance Provided By
Property Owner
Drilling Process Water Obtained From
Well
Pump Installed By Driller?
N

COMMENTS

Comments
took 1.5 days to drill, we let sit over night and had residual water, tested @ 3 gpm the following day