Skip to Main Content

Driller Report Summary

WELL NUMBER

Well Number
20241841
Driller Tag Number
D0129605
Inspection Tag Number
-
Date Received
07/29/2024

WELL CONTRACTOR

License Number
886
Driller Name
Calvin W. Rose
Rig Operator
CALVIN ROSE

WELL LOCATION

County Name
LOUDON
Driller Map No.
-
Quad Name
MEADOW
Quad Number
0139NW
Quad Nth
1
Address
31301-32127 AXLEY CHAPEL RD
Address Line 2
-
City Name
GREENBACK
State Name
Tennessee
Zip
37742
Zip Ext
-
Distance From Landmark (miles)
-
Direction From Landmark
-
Nearest Landmark
-
Latitude
35.7092229
Longitude
-84.2201269

TYPE OF WORK

Date Drill Rig Left Site
05/28/2024
Type of Work
New Well

WELL COMPLETION DATA

Completion Date
05/28/2024
Total Depth (ft-bgs)
700
Depth To Bedrock (ft)
90
Static Level (ft-bgs)
90
Estimated Yield (GPM)
1

WATER-BEARING ZONES

WELL TEST

Tested By
-
Static Level (ft-bgs)
-
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
-
Hours Prior to Test
-
Minutes Prior to Test
-

FORMATION LOG

123700LIMESTONE
90123LIIMESTONE
050CLAY

WELL OWNER INFORMATION

Company Name
-
Owner Name
VAL SIMON
Address
32111 AXLEY CHAPEL ROAD
Address (Line 2)
-
City
GREENBACK
State
Tennessee
Zip Code
37742

PROPOSED USE OF WELL

Well Use
Residential

PRIMARY CASING

Diameter (in)
6
Top Set (in-above ground)
12
Primary Casing Depth (ft-bgs)
123
Primary Casing Type
Steel
Wall Thickness
.188
SDR#
-

WELL FINISH

Well Finish
Open Hole
From (ft-bgs)
123
To (ft-bgs)
700
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-

BACK FILL MATERIAL

Bentonite310
Cuttings10123

LINER CASING

Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-

ANTICIPATED WATER QUALITY

Appearance
Clear
Taste
Good
Odor
-
Other
-

GENERAL INFORMATION

Well Disinfected?
Y
Well Capped?
Y
50ft From Septic System?
Y
Septic Distance Provided By
Driller Determination
Drilling Process Water Obtained From
Well
Pump Installed By Driller?
N

COMMENTS

Comments
zoned hydrofracked 680-180, 1,000 gallon of water per 100 ft, original gpm 1 took to 7 gpm