Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
Guest
---
Go to Home Page
Driller Report Summary
Back
Print
WELL NUMBER
Well Number
20243090
Driller Tag Number
D0133354
Inspection Tag Number
-
Date Received
11/20/2024
WELL CONTRACTOR
License Number
1170
Driller Name
David Anthony Mills
Rig Operator
DAVID MILLS JASON LADD JJ MILLS
WELL LOCATION
County Name
RHEA
Driller Map No.
-
Quad Name
MORGAN-SPRINGS
Quad Number
0110SE
Quad Nth
7
Address
125 BLUFF VIEW DR
Address Line 2
-
City Name
DAYTON
State Name
Tennessee
Zip
37321
Zip Ext
-
Distance From Landmark (miles)
3.5
Direction From Landmark
S
Nearest Landmark
Hwy 30 E
Latitude
35.5102647
Longitude
-85.095836
TYPE OF WORK
Date Drill Rig Left Site
09/25/2024
Type of Work
New Well
WELL COMPLETION DATA
Completion Date
09/25/2024
Total Depth (ft-bgs)
320
Depth To Bedrock (ft)
3
Static Level (ft-bgs)
47
Estimated Yield (GPM)
155
WATER-BEARING ZONES
Depth (ft-bgs)
GPM
GPH
Water Quality
163
100
-
good
588
15
-
good
272
40
-
good
WELL TEST
Tested By
Blowing
Static Level (ft-bgs)
-
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
-
Hours Prior to Test
-
Minutes Prior to Test
-
FORMATION LOG
Depth from (ft)
Depth to (ft)
Description
0
3
OVERBURDEN
3
26
SS GRAY W/SPOT AT 26
26
36
SS GRAY
36
38
COAL SEAM
38
47
SHALE DARK GRAY
47
50
SS GRAY
50
58
SHALE
58
81
SS LIGHT GRAY W/WATER @ 58 FT
81
143
SHALE HARD DARK GRAY
WELL OWNER INFORMATION
Company Name
-
Owner Name
JIMMY JEWEL
Address
125 BLUFF VIEW DRIVE
Address (Line 2)
-
City
DAYTON
State
Tennessee
Zip Code
37321
PROPOSED USE OF WELL
Well Use
Irrigation
PRIMARY CASING
Diameter (in)
8
Top Set (in-above ground)
12
Primary Casing Depth (ft-bgs)
20
Primary Casing Type
Steel
Wall Thickness
.188
SDR#
-
WELL FINISH
Well Finish
Open Hole
From (ft-bgs)
20
To (ft-bgs)
320
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-
BACK FILL MATERIAL
Back Fill Type
From (ft-bgs)
To (ft-bgs)
Bentonite
3
10
Cuttings
10
20
LINER CASING
Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-
ANTICIPATED WATER QUALITY
Appearance
Clear
Taste
Good
Odor
-
Other
Iron
GENERAL INFORMATION
Well Disinfected?
Y
Well Capped?
Y
50ft From Septic System?
Y
Septic Distance Provided By
Driller Determination
Drilling Process Water Obtained From
Public Supply
Pump Installed By Driller?
N
COMMENTS
Comments
set 21 ft of 8 in casing no shoe, possibly hit more than 125 gpm due to the air holding back some water