Skip to Main Content
DataViewer - Division of Water Resources (DWR)
Page Help
Guest
---
Go to Home Page
Driller Report Summary
Back
Print
WELL NUMBER
Well Number
20243226
Driller Tag Number
BA5296
Inspection Tag Number
-
Date Received
11/26/2024
WELL CONTRACTOR
License Number
1014
Driller Name
J. Brandon Allen
Rig Operator
MARK COX
WELL LOCATION
County Name
DICKSON
Driller Map No.
-
Quad Name
DICKSON
Quad Number
0048SW
Quad Nth
5
Address
125 ROBINSON RD
Address Line 2
-
City Name
DICKSON
State Name
Tennessee
Zip
37055
Zip Ext
4015
Distance From Landmark (miles)
-
Direction From Landmark
-
Nearest Landmark
-
Latitude
36.0669618
Longitude
-87.4180582
TYPE OF WORK
Date Drill Rig Left Site
11/13/2024
Type of Work
Backfill and Abandon
WELL COMPLETION DATA
Completion Date
11/13/2024
Total Depth (ft-bgs)
160
Depth To Bedrock (ft)
-
Static Level (ft-bgs)
128
Estimated Yield (GPM)
-
WATER-BEARING ZONES
Depth (ft-bgs)
GPM
GPH
Water Quality
-
-
-
-
WELL TEST
Tested By
-
Static Level (ft-bgs)
-
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
-
Hours Prior to Test
-
Minutes Prior to Test
-
FORMATION LOG
Depth from (ft)
Depth to (ft)
Description
-
-
-
WELL OWNER INFORMATION
Company Name
-
Owner Name
JON ARMSTRONG
Address
125 ROBINSON RD
Address (Line 2)
-
City
DICKSON
State
Tennessee
Zip Code
-
PROPOSED USE OF WELL
Well Use
Unknown
PRIMARY CASING
Diameter (in)
6
Top Set (in-above ground)
-
Primary Casing Depth (ft-bgs)
-
Primary Casing Type
-
Wall Thickness
-
SDR#
-
WELL FINISH
Well Finish
-
From (ft-bgs)
-
To (ft-bgs)
-
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-
BACK FILL MATERIAL
No Data Found
LINER CASING
Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-
ANTICIPATED WATER QUALITY
Appearance
-
Taste
-
Odor
-
Other
-
GENERAL INFORMATION
Well Disinfected?
Y
Well Capped?
-
50ft From Septic System?
-
Septic Distance Provided By
-
Drilling Process Water Obtained From
-
Pump Installed By Driller?
-
COMMENTS
Comments
pump and piping removed, casing left in place and cut below ground level, no liner, 1 cup chlorine, backfill: cement 0-4 1 94 lb bag gravity, hole plug 4-160 38 50 lb bags gravity