Skip to Main Content

Driller Report Summary

WELL NUMBER

Well Number
20242111
Driller Tag Number
BA5250
Inspection Tag Number
-
Date Received
08/20/2024

WELL CONTRACTOR

License Number
956
Driller Name
James Clifton Watson
Rig Operator
WATSON CO #956

WELL LOCATION

County Name
MAURY
Driller Map No.
-
Quad Name
CARTERS-CREEK
Quad Number
0064NW
Quad Nth
9
Address
ROCKY BANK LN
Address Line 2
-
City Name
SPRING HILL
State Name
Tennessee
Zip
37174
Zip Ext
4222
Distance From Landmark (miles)
-
Direction From Landmark
-
Nearest Landmark
-
Latitude
35.6506761
Longitude
-86.9007007

TYPE OF WORK

Date Drill Rig Left Site
06/18/2024
Type of Work
Backfill and Abandon

WELL COMPLETION DATA

Completion Date
06/18/2024
Total Depth (ft-bgs)
275
Depth To Bedrock (ft)
-
Static Level (ft-bgs)
40
Estimated Yield (GPM)
-

WATER-BEARING ZONES

WELL TEST

Tested By
-
Static Level (ft-bgs)
-
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
-
Hours Prior to Test
-
Minutes Prior to Test
-

WELL OWNER INFORMATION

Company Name
KENNETH RICK CONSTRUCTION
Owner Name
KENNETH RICH
Address
109 HOLDAY COURT
Address (Line 2)
-
City
FRANKLIN
State
Tennessee
Zip Code
37067

PROPOSED USE OF WELL

Well Use
Industrial

PRIMARY CASING

Diameter (in)
6
Top Set (in-above ground)
-
Primary Casing Depth (ft-bgs)
-
Primary Casing Type
-
Wall Thickness
-
SDR#
-

WELL FINISH

Well Finish
-
From (ft-bgs)
-
To (ft-bgs)
-
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-

BACK FILL MATERIAL

No Data Found

LINER CASING

Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-

ANTICIPATED WATER QUALITY

Appearance
-
Taste
-
Odor
-
Other
-

GENERAL INFORMATION

Well Disinfected?
-
Well Capped?
-
50ft From Septic System?
-
Septic Distance Provided By
-
Drilling Process Water Obtained From
-
Pump Installed By Driller?
-

COMMENTS

Comments
no pump, casing left in place and not cut below ground level, no liner, no disinfection information provided, backfill: 0-5 1.5 bags gravity, gravel 5-25 gravity, bentonite 25-50 8 bags gravity, gravel 50-275 gravel Marlon Creek Phase 1 is the subdivision