Skip to Main Content

Driller Report Summary

WELL NUMBER

Well Number
20221414
Driller Tag Number
D0124153
Inspection Tag Number
064005
Date Received
07/05/2022

WELL CONTRACTOR

License Number
928
Driller Name
Tommy Dale Turner
Rig Operator
TOMMY TURNER

WELL LOCATION

County Name
SEVIER
Driller Map No.
5CW
Quad Name
WEAR-COVE
Quad Number
0157NW
Quad Nth
3
Address
3490 QUAIL WAY
Address Line 2
-
City Name
SEVIERVILLE
State Name
Tennessee
Zip
37862
Zip Ext
-
Distance From Landmark (miles)
-
Direction From Landmark
-
Nearest Landmark
-
Latitude
35.723722
Longitude
-83.652472

TYPE OF WORK

Date Drill Rig Left Site
04/25/2022
Type of Work
New Well

WELL COMPLETION DATA

Completion Date
04/25/2022
Total Depth (ft-bgs)
800
Depth To Bedrock (ft)
115
Static Level (ft-bgs)
150
Estimated Yield (GPM)
15

WATER-BEARING ZONES

WELL TEST

Tested By
Blowing
Static Level (ft-bgs)
150
Pumping Level (ft-bgs)
-
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
15
Hours Prior to Test
-
Minutes Prior to Test
-

FORMATION LOG

0115soft red sandstone
115800blue sandstone

WELL OWNER INFORMATION

Company Name
FAITH BUILDERS
Owner Name
Address
-
Address (Line 2)
-
City
-
State
-
Zip Code
-

PROPOSED USE OF WELL

Well Use
Residential

PRIMARY CASING

Diameter (in)
6
Top Set (in-above ground)
12
Primary Casing Depth (ft-bgs)
125
Primary Casing Type
Steel
Wall Thickness
0.19
SDR#
-

WELL FINISH

Well Finish
Open Hole
From (ft-bgs)
125
To (ft-bgs)
800
Screen Type
-
Slot Size (in)
-
Gravel Pack From (ft-bgs)
-
Gravel Pack To (ft-bgs)
-

BACK FILL MATERIAL

Bentonite020
Cuttings20125

LINER CASING

Type
None
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
N
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-

ANTICIPATED WATER QUALITY

Appearance
Clear
Taste
-
Odor
-
Other
-

GENERAL INFORMATION

Well Disinfected?
Y
Well Capped?
Y
50ft From Septic System?
Y
Septic Distance Provided By
Driller Determination
Drilling Process Water Obtained From
Well
Pump Installed By Driller?
N

COMMENTS

Comments
Corrected lat/long of well location based on inspection report by Chris Maner, KEFO. RAB, DWR 8 June 2023