Skip to Main Content

Driller Report Summary

WELL NUMBER

Well Number
20241578
Driller Tag Number
D0131297
Inspection Tag Number
-
Date Received
07/01/2024

WELL CONTRACTOR

License Number
1078
Driller Name
Christopher Jordan Gilreath
Rig Operator
CLINT FERGE

WELL LOCATION

County Name
FAYETTE
Driller Map No.
-
Quad Name
OAKLAND
Quad Number
0416NE
Quad Nth
3
Address
1550 MEBANE RD
Address Line 2
-
City Name
OAKLAND
State Name
Tennessee
Zip
38060
Zip Ext
-
Distance From Landmark (miles)
1.2
Direction From Landmark
W
Nearest Landmark
Hwy 194
Latitude
35.21195
Longitude
-89.5361178

TYPE OF WORK

Date Drill Rig Left Site
05/29/2024
Type of Work
New Well

WELL COMPLETION DATA

Completion Date
05/29/2024
Total Depth (ft-bgs)
160
Depth To Bedrock (ft)
-
Static Level (ft-bgs)
60
Estimated Yield (GPM)
24

WATER-BEARING ZONES

WELL TEST

Tested By
Pumping
Static Level (ft-bgs)
160
Pumping Level (ft-bgs)
110
Test After Hours
-
Test After Mins
-
Test Yield (GPM)
24
Hours Prior to Test
-
Minutes Prior to Test
-

FORMATION LOG

3560MEDIUM COARSE BROWN SAND
6080MEDIUM SAND CLAY STREAKS
80160NEDUYN WHITE SAND
035RED SAND

WELL OWNER INFORMATION

Company Name
SOUTHERN SERENTIY
Owner Name
GARRETT & NATALIE PILGRAM
Address
11695 HWY 70 STE 104
Address (Line 2)
-
City
ARLINGTON
State
Tennessee
Zip Code
38002

PROPOSED USE OF WELL

Well Use
Residential

PRIMARY CASING

Diameter (in)
4
Top Set (in-above ground)
6
Primary Casing Depth (ft-bgs)
150
Primary Casing Type
Plastic
Wall Thickness
160
SDR#
26

WELL FINISH

Well Finish
Screen
From (ft-bgs)
150
To (ft-bgs)
160
Screen Type
Plastic
Slot Size (in)
0.03
Gravel Pack From (ft-bgs)
140
Gravel Pack To (ft-bgs)
160

BACK FILL MATERIAL

Bentonite010
Cuttings10150

LINER CASING

Type
-
Diameter (in)
-
From (ft-bgs)
-
To (ft-bgs)
-
Packers Installed?
-
Packer 1 Depth (ft-bgs)
-
Packer 2 Depth (ft-bgs)
-

ANTICIPATED WATER QUALITY

Appearance
Clear
Taste
Good
Odor
-
Other
-

GENERAL INFORMATION

Well Disinfected?
Y
Well Capped?
Y
50ft From Septic System?
Y
Septic Distance Provided By
Driller Determination
Drilling Process Water Obtained From
Public Supply
Pump Installed By Driller?
Y

COMMENTS

Comments
-