414Columbia Power and Water Systems Water WithdrawalMauryColumbiaMauryColumbia

Permit Information

NRS23.228
ARAP
Individual Permit
Active
Columbia Power & Water Systems
CPWS Water Treatment Plant Intake
Columbia Power and Water Systems is seeking to revoke its permit (NRS18.285) for withdrawal of up to 20 million gallons a day from the Duck River near river mile 134 and proposes issuance of a new permit that would renew the existing withdrawal and include construction of a new intake near river mile 100 capable of providing 32 million gallons per day. The new intake would supply water to a proposed new 12 million gallons per day water treatment plant and to the existing water treatment plant, operating in tandem with the existing intake to withdraw up to 32 million gallons per day.
M
09-JUN-2023
21-DEC-2022
09-JUN-2023
12-SEP-2023
15-MAR-2024
15-MAR-2024
14-MAR-2029
Duck River
26-MAR-2024 12:26PM

Other DWR permits at this site

No other permits found.

Permit Documents

View
ApplicationCPWS Economic Benefit Analysis Technical Memorandum 2 01-APR-2021
ApplicationCPWS Duck River OASIS and Ecological Flow Modeling01-APR-2021
LetterTDEC ARAP Modification Letter- Signed01-APR-2021
ApplicationARAP No. NRS18.285 Modification Attachment 101-APR-2021
ApplicationCPWS Alternatives Analysis Technical Memorandum 1 Final01-APR-2021
AddendumARAP Payment24-MAY-2021
AddendumOASIS Wetted Perimeter New Intake1_Redacted02-NOV-2021
Addendumwetted perimeter report20-JUN-2022
Emailemail from agent regarding application timelines29-NOV-2022
Notice of DeficiencyRequest for Additional Information21-DEC-2022
Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet.

Inspections

no data found