Tennessee Division of Water Resources (DWR) Permits Documents Permit Appeals Moratoriums Complaints Inspections Eng. Plans Hydrologic Det. Exceptional Waters Ambient Monitoring QLP Data Oil & Gas Wells FTC Operator Certification Water Wells Site IDParent SiteLocationCityCountyGIS 6426T and T GilkeyGilkey Road ParisHenryView Map Permit Information Help Back to Previous Page Permit NumberTN0074888Permittee NameJames Tosh Project NameT and T GilkeyPermit TypeCAFO-IndividualStatusReissuancePermit RatingIFacility ClassificationRDischarge CodeApplication Received03-JAN-2023Application Returned19-DEC-2022Application Complete06-FEB-2023Public Notice Date14-FEB-2023Issuance Date20-APR-2023Effective Date01-AUG-2023Expiration Date31-JUL-2028Modification DateTermination DateReceiving StreamNeil Ditch to Guins CreekEffluent Descriptionoverflow of process wastewater from a facility designed, constructed, operated, and maintained to contain all process-generated wastewater plus the runoff from a 25-year, 24-hour rainfall eventSIC Code0213Activity DescriptionSixteen barn hog operation holding 960 head each, total capacity of 15,360 head.Treatment Descriptionthree cell lagoon system with 27.6 million gallon capacityFlow Rate [MGD]Record Last Updated07-SEP-2023 02:20PM Permit Documents Search All Documents View Permit ViewFile TypeDescriptionDocument Date PermitFinal Permit19-APR-2023 Draft PermitDraft Permit17-FEB-2023 LetterDelegated Signatory Letter (Updated)18-JAN-2022 Inspection Report5-21-21 Inspection Document TN0074888 T and T Gilkey21-MAY-2021 Report2019 Annual Report Gilkey T&T20-FEB-2020 Report2018 Annual Report21-FEB-2019 PermitFinal Permit27-JUN-2018 Engineering ReportOld Permit Application with Design Information14-MAY-2018 ReportOld Inspection Report (2003)14-MAY-2018 ReportOld Inspection Report (2002)14-MAY-2018 row(s) 1 - 10 of 22Next FileNet Documents Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet. Inspections Inspection DateTypeResult 21-MAY-2021CAFO Non-SamplingIn Compliance 22-JUN-2017CAFO Non-SamplingImmediately Corrected During Inspection 17-JUN-2014Compliance Eval (non-sampling) (CEI)Notice of Deficiency 29-MAR-2010CAFO Non-SamplingIn Compliance 11-MAR-2008CAFO Non-SamplingIn Compliance 27-SEP-2006CAFO Non-SamplingIn Compliance 06-DEC-2005Compliance Eval (non-sampling) (CEI)NOV row(s) 1 - 7 of 7
     Tennessee Division of Water Resources (DWR)