| NCO conducted a pretreatment audit inspection in November 2022 and it was determined the Adamsville STP was out of compliance. A notice of violation was issued September 2023. At the time of the pretreatment compliance inspection, Adamsville STP was still out of compliance. However, efforts were being made to return back to compliance. |