| Bill Tyler said Alamo was waiting to hear from their engineer about the best way to handle the grit removal system. A technician from Labtronx will be in Alamo next month to calibrate lab equipment and the flow meters. The chlorine detector in the chlorine room has not been repaired. He said they are still trying to find out what kind of valve is in the clarifier so they can replace it. |