| W/ AJF, ADC - NOV for downstream low-water crossing having channel mostly impounded which also impedes the movement of aquatic life, and also for 2 concrete slabs that have been placed in stream as an apparent walkway that have the stream mostly impounded and impedes the movement of aquatic life.
Also, excavation is being performed at the upstream crossing to remove sediment from the crossing. It appears that excavation work has not been separated from flowing waters, but evidence of this could not be substantiated. Warning and recommendation to perform this work in the dry was issued because of this. |