| I met with Brian Edwards and David Parham and then toured the lagoon. Bruceton is planning to begin receiving leachate from EWS in Camden as soon as the engineer finishes working up limits. Brian said that at current flows the lagoon has a 40 to 45 day detention period.
The STP was well maintained and appeared to be functioning satisfactorily. The design flow is .572 MGD but the plant is only averaging .185 MGD. |