| Flow samples should be representative Clarifier surface debris removed, weirs deteriorating and needs wash down daily. Sludge handling should revert back to using aerobic digester and drying beds Grit chamber must be put back in service Muffin Monster evaluated to is operation Sulphur dioxide room fan not operating I/I problem |