| Meet with John Beasley, Camden Supt. water and wastewater and water, Steve Pudlo,PE, consultant engineer , David Tuck, Operator and, Anthony French, Operator at spray irrigation system. 8 out of 13 spray sights have been repaired due to construction installation problems. Spray header lines not buried at correct depth and spray units put at wrong height. All of the problems should be corrected by mid Summer. All spray fields will be functional at this time.. |