Tennessee Division of Water Resources (DWR) Permits Documents Permit Appeals Moratoriums Complaints Inspections Eng. Plans Hydrologic Det. Exceptional Waters Ambient Monitoring QLP Data Oil & Gas Wells FTC Operator Certification Water Wells Site IDParent SiteLocationCityCounty 10987City of Knoxville Municipal Separate Storm Drain SystemRoom 480 400 Main St KnoxvilleKnox Permit Information Help Back to Previous Page Permit NumberIWTOLD001Permittee NameKnoxville Utility BoardProject NamePermit TypeIWTStatusNewPermit RatingFacility ClassificationDischarge CodeApplication Received23-JUL-2007Application ReturnedApplication CompletePublic Notice DateIssuance DateEffective DateExpiration DateModification DateTermination DateReceiving Stream1. Holston River/Watauga River watershed; 5.12 million gallons per day (MGD) from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed; 2. 0.095 MGD from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Eastbridge STP which is located in the Holston River/Watauga River watershed; 3. 0.332 MGD from the Martin B. Whitaker Water Treatment Plant which is located in the Upper Tennessee River/Clinch River/Emory River watershed to the Shady Grove PS which is located in the Holston River/Watauga River watersEffluent Description1. Holston River/Watauga River watershed; 5.12 million gallons per day (MGD) from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed; 2. 0.095 MGD from the Martin B. Whitaker Water Treatment Plant located in the Upper Tennessee River/Clinch River/Emory River watershed is discharged through the Eastbridge STP which is located in the Holston River/Watauga River watershed; 3. 0.332 MGD from the Martin B. Whitaker Water Treatment Plant which is located in the Upper Tennessee River/Clinch River/Emory River watershed to the Shady Grove PS which is located in the Holston River/Watauga River watersSIC CodeActivity DescriptionFrom the Upper Tennessee River watershed to Holston River watershed: 5.12 million gallons per day (MGD) through the Loves Creek STP and 0.095 MGD through the Eastbridge STP; and 0.332 MGD to the French Broad through the Shady Grove PS.Treatment DescriptionUpper Tennessee River/Clinch River/Emory River watershed is discharged through the Loves Creek Sewage Treatment Plant (STP) which is located in the Holston River/Watauga River watershed;Flow Rate [MGD]Record Last Updated26-JAN-2024 11:06AM Permit Documents Search All Documents ViewFile TypeDescriptionDocument Date ReportRCVD 16-SEP-24: report re: transfer from the Tennessee River to Holston River; and from the Tennessee River to French Broad River. July 2023 thru June 2024 by Kevin Keaton16-SEP-2024 LetterRCVD 03-OCT-23: letter re: annual report by Kevin Keaton03-OCT-2023 Report2021-2022 Annual29-SEP-2022 Report2020-2021 Annual Report28-SEP-2021 ReportInter-basin Water Transfer Report01-OCT-2020 Report2019-20 Annual Report KUB18-SEP-2020 ReportRCVD 24-Sep-19: letter to Jim McAdoo re: annual report by Kevin Keaton24-SEP-2019 LetterRCVD 19-SEP-18: letter re: annual report by Kevin Keaton.19-SEP-2018 Letter2016 - 2017 annual report27-SEP-2017 Letter2015 - 2016 Annual report23-SEP-2016 row(s) 1 - 10 of 13Next FileNet Documents Forms submitted through MyTDEC Forms after 11/17/2020 will be available in FileNet. Inspections no data found
     Tennessee Division of Water Resources (DWR)