Skip to Main Content
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**

Site Details

Site IDSite NameSite LocationCounty
4891Vulcan Construction Materials, LLC dba Savanah Quarry12475 Highway 64 EastHardin

Permit Details

Permit NumberPermit TypePermittee NamePermit StatusExpiration Date
TN0003085MiningVulcan Construction Materials, LLCModification8/31/2028

Inspection Details

100296
CWA
In Compliance
10/27/2021
Compliance Eval (non-sampling) (CEI)
Site was In Compliance. Inspection was conducted as a routine inspection. Site was active at time of inspection.

Drainage at the site is controlled through basins or BMPs. Drainage from area that is being stripped is directed into pit area. Drainage from road that goes around the perimeter of the eastern and northern portion of the site is directed back into pit.

There was a discharge at Outfall 001. The discharge water appeared clear. I also looked at where discharge water flows into Steele Creek and there was no color contrast observed. The water in Steele Creek appeared clear and the discharge water flowing into Steele Creek appeared clear at time of inspection. DMRs have been submitted as required and have been In Compliance.

Facility discussed that they are wanting to move sump over next to eastern high wall and add a new outfall that will discharge into Spencer Branch. The discharge will be a pump discharge. Facility is planning to submit this request in a modification application.