Skip to Main Content
Dataviewer - Division of Mineral & Geologic Resources
guest
---
Sign Out
Permits
ARAP Specific
ARAP Mitigation Report
Mining Specific
Permitting Activity Report
TMSP Specific
Documents
Complaints
Inspections
Oil and Gas Well Permits
Division of Water Resources Dataviewer
Ambient Monitoring
Exceptional Waters
Hydrologic Determinations
Inspection Search
Inspection Details
Breadcrumb
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**
Site Details
Site ID
Site Name
Site Location
County
6135
Dunlap Stone, Inc.
42995 State Road 30
Bledsoe
Permit Details
Permit Number
Permit Type
Permittee Name
Permit Status
Expiration Date
NR21MS.007
ARAP
Dunlap Stone, Inc.
Active
7/31/2026
Inspection Details
Cancel
Inspection ID
105114
Statute
CWA
Results
In Compliance
Inspection Date
11/22/2021
Mulit-Day Start Date
Inspection Type
ARAP Compliance Inspection - Mining
Notes
This ARAP was inspected on November 22, 2021. All the gravel fill material has been removed from the stream reach to be reconstructed. Appropriate BMPs are in place to prevent sediment migration off site. When under construction, water is pumped from the top of the stream reach through a silt sock before discharge. When inactive water from the stream channel is routed down a tarp lined ditch and through waddles before discharge. No evidence of sediment accumulation was present downstream of the reconstruction.
Biomonitoring Method