Skip to Main Content
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**

Site Details

Site IDSite NameSite LocationCounty
4891Vulcan Construction Materials, LLC dba Savanah Quarry12475 Highway 64 EastHardin

Permit Details

Permit NumberPermit TypePermittee NamePermit StatusExpiration Date
TN0003085MiningVulcan Construction Materials, LLCModification8/31/2028

Inspection Details

60141
CWA
In Compliance
1/25/2018
Compliance Eval (non-sampling) (CEI)
Site was active on day of Inspection.

All drainage was controlled through basins or BMPs.

Outfall 001 was discharging on day of Inspection. Discharge water appeared clear. DMRs have been submitted as required and are In Compliance.

There is a new sump pond location. This change will be shown on the Site Plans that will be submitted for Permit Renewal in the next 2-3 weeks. The old sump pond drains to the new sump pond location.

For further information regarding inspection please refer to 1-25-18 Inspection Report.