Skip to Main Content
Dataviewer - Division of Mineral & Geologic Resources
guest
---
Sign Out
Permits
ARAP Specific
ARAP Mitigation Report
Mining Specific
Permitting Activity Report
TMSP Specific
Documents
Complaints
Inspections
Oil and Gas Well Permits
Division of Water Resources Dataviewer
Ambient Monitoring
Exceptional Waters
Hydrologic Determinations
Inspection Search
Inspection Details
Breadcrumb
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**
Site Details
Site ID
Site Name
Site Location
County
5685
USB Tennessee, LLC - Mine No. 3 Rich Pit
179 Cypress Rd
Weakley
Permit Details
Permit Number
Permit Type
Permittee Name
Permit Status
Expiration Date
TN0063029
Mining
USB Tennessee, LLC
Modification
2/28/2025
Inspection Details
Cancel
Inspection ID
100830
Statute
CWA
Results
In Compliance
Inspection Date
5/14/2021
Mulit-Day Start Date
Inspection Type
Compliance Eval (non-sampling) (CEI)
Notes
Drainage at the site was controlled through basins or BMPs. Facility has just started constructing berms in the western/northwestern portion of Mine Area B this week. Reminded facility as they continue to construct the berms to make sure they stabilize the outslopes of the berms by seeding and mulching. A berm has been built along the western/northwestern portion of Mine Area B where the facility is proposing to disturb a new 6.83 acre area within their currently permitted area. Drainage from this area will flow to this northwest portion of Mine Area B and the facility is proposing installing a sump and will pump stormwater from the northwest corner of Mine Area B to Sediment Pond 4 as needed. The water in Sediment Pond 4 where Outfall 002 is located appeared clear at the time of inspection. Outfall 002 was discharging. The discharge water appeared clear. Discussed sampling requirements with facility. Requested facility to email me a copy of the sample results. The emergency spillway for the newly constructed Sediment Pond 4 needed some additional rip rap. I requested facility to send me some pictures of the emergency spillway once they added some additional rip rap. I also, requested the facility to have sediment pond 4 certified by an engineer that it has been built to the design specifications outlined in their approved mining plans. I emailed an example treatment pond certification form to the facility on 5/17/21. Refer to the TDEC dataviewer for a supplemental photo log.