Skip to Main Content
Dataviewer - Division of Mineral & Geologic Resources
guest
---
Sign Out
Permits
ARAP Specific
ARAP Mitigation Report
Mining Specific
Permitting Activity Report
TMSP Specific
Documents
Complaints
Inspections
Oil and Gas Well Permits
Division of Water Resources Dataviewer
Ambient Monitoring
Exceptional Waters
Hydrologic Determinations
Inspection Search
Inspection Details
Breadcrumb
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**
Site Details
Site ID
Site Name
Site Location
County
26605
Lhoist North America of Tennessee, LLC dba H. C. Spinks Clay Company, Inc. - Karen Brown - Mine #31
Seminary Church Road
Weakley
Permit Details
Permit Number
Permit Type
Permittee Name
Permit Status
Expiration Date
TN0076155
Mining
Lhoist North America of Tennessee, LLC dba H. C. Spinks Clay Company, Inc.
Active
5/31/2029
Inspection Details
Cancel
Inspection ID
101818
Statute
CWA
Results
Out of Compliance
Inspection Date
6/24/2021
Mulit-Day Start Date
Inspection Type
Follow-up
Notes
Follow up Inspection conducted to collect water quality data from Pond 2 and where the seep is flowing into the UNT to Bear Creek. I also checked to see if BMP issues noted during 5-27-21 Follow-Up inspection had been corrected.
The BMP issues noted during the 5-27-21 inspection had been corrected. Facility needs to closely monitor BMPs and make repairs as needed.
The seep was still flowing from the bank between the northwest portion of Pond 2 and the UNT to Bear Creek. The temperature of the water in the UNT to Bear Creek up-stream of the seep was a little over 4 degrees cooler than the water flowing from the seep. The temperature of the water in Pond 2 and of the seep was very close to the same temperature. It appears the source of the seep may be Pond 2. Facility and I discussed lowering level of Pond 2 so a more thorough inspection of the bank of Pond 2 can be done.
Facility is supposed to submit a Stream Remediation Plan for the UNT to Bear Creek by tomorrow June 25, 2021.
Please refer to the dataviewer for supplemental information and inspection pictures.
Biomonitoring Method