Skip to Main Content
**Data updates from internal databases on a nightly basis. Please, contact TDEC Help Desk at BG-Help_Desk@tn.gov or call (615) 532-0287 for assistance.**

Site Details

Site IDSite NameSite LocationCounty
5883Vulcan Construction Materials, LLC dba Kodak Quarry3360 Winfield Dunn ParkwaySevier

Permit Details

Permit NumberPermit TypePermittee NamePermit StatusExpiration Date
TN0065951MiningVulcan Construction Materials, LLCReissuance10/31/2027

Inspection Details

88096
CWA
In Compliance
5/4/2021
Compliance Eval (non-sampling) (CEI)
TDEC inspector Becky Lenz met with Matt Belcher to inspect the site. DMP 001 was constructed but was not discharging at the time of inspection. DMRs show that DMP 001 does not discharge, has not in years. DMP 002 is not constructed yet. The ponds look good.
The site only produces a couple months out of the year.
This site is in compliance.